Thyssenkrupp Levant Stair Lift Installation Manual Top 【iPhone】

Confirm the stairs can support the weight of the rail and the user. Step 1: Rail Preparation and Assembly

| Check | Requirement | |-------|-------------| | | Minimum 36” (91 cm) clear between handrail/bannister and wall | | Turn & landings | Minimum 12” (30 cm) flat landing at top for safe dismount | | Obstructions | Radiators, light switches, door swings, low ceiling beams | | Power source | Standard grounded 110-120V outlet within 6 ft (1.8m) of either end. Never extend with household cord. | | Track angle | Levant supports 25°–45° standard; heavy-duty for up to 50° | thyssenkrupp levant stair lift installation manual top

Rotate the seat away from its locked driving position. Attempt to operate the lift; the unit must refuse to move until the seat is swiveled back and locked into its riding profile. Preventive Maintenance Overview Confirm the stairs can support the weight of

Plug in the electronic cables running from the armrest controls and safety sensors to the main carriage. | | Track angle | Levant supports 25°–45°